Scene: New energy industry, warehousing and transportation scenario.
Solution: The project customizes AGVs, non-standard loading material racks, and bearing structures to achieveconnection between front-end and back-end conveyor belts. Double-layer conveyor line, the upper layer loads full material racks, the lower layer loads empty material racks, with ±5mm docking accuracy. Achieves efficient unmanned operation.
Value: Warehouse and logistics operators are reduced by 50%, eliminating cross-area personnel operations, while improving warehouse and production operational efficiency, and achieving full automation of production material supply for the entire workshop.
Seamless connection from unmanned sorting line to fully automated production line, reducing warehouse and logistics operators by 50%
Improved the operational efficiency of the warehouse and production, and also achieved full automation of production material supply for the entire workshop
Design phase technical agreement supply content presented to the customer in drawings, secondary confirmation, controlling project risk
A strong engineering site team ensures smooth construction, commissioning, and production support processes, meeting the on-site opinions and requirements put forward by customers